Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Early childhood educator
15%
#622 / 633
View rankingEarly childhood educator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan activities, reports and rubrics.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Write to families.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Care, play and hold the room.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Hygiene, meals and naps.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Watch development and talk to the family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Coordinate staff and safeguarding.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Plan activities, reports and rubrics
- Write to families
- Care, play and hold the room
- Hygiene, meals and naps
- Watch development and talk to the family
- Coordinate staff and safeguarding
- educador infantil
- maestro de infantil
- preschool
- jardin de infancia
Sources for this job· O*NET 25-2011.00· ESCO/ISCO 2342