Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
ENT doctor
21%
#432 / 633
View rankingENT doctor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read audiograms, CT and a first plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Clinic, nasal endoscopy and otoscopy.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Ear, sinus and tonsil surgery.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 10% | +1.8 |
Explain, consent and difficult vertigo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Reports, prescriptions and speech-therapy coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
On-call, nosebleeds and liability for the act.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- care for patients
- diagnose
- nursing care
- clinical notes
- Read audiograms, CT and a first plan
- Clinic, nasal endoscopy and otoscopy
- Ear, sinus and tonsil surgery
- Explain, consent and difficult vertigo
- otorrino
- otorrinolaringologo
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212