IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Headteacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Timetable, quotas and the staff.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Family, the complaint and the one that reaches inspection.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Behaviour, the sanction and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Budget, the club and not leaving a hole.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspection, the figure and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That Monday holds, and not hiding the clash.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • school timetables
  • quotas
  • behaviour
  • sanctions
  • school budget
  • inspection
  • family complaints
  • senior staff

Sources for this job· O*NET 11-9032.00· ESCO/ISCO 1345

Analyse my job

Jobs with similar scores

  1. 238Aerospace engineer25%
  2. 239Environmental engineer25%
  3. 240Biomedical engineer25%
  4. 242Petroleum engineer25%
  5. 243Production engineer25%
  6. 244Robotics engineer25%