IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Heritage interpreter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Script, the group and the time.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Room, the question and the one who will not listen.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The piece, the context and not making it up.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
School group, the yard and getting them to touch carefully.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The director, capacity and not overcrowding.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they look at the stone, and not just the phone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tour scripts
  • school groups
  • pieces
  • historical context
  • capacity
  • not make it up
  • heritage
  • guided visits

Sources for this job· O*NET 25-4012.00· ESCO/ISCO 2621

Analyse my job

Jobs with similar scores

  1. 243Aerospace engineer25%
  2. 244Environmental engineer25%
  3. 245Biomedical engineer25%
  4. 247Petroleum engineer25%
  5. 248Production engineer25%
  6. 249Robotics engineer25%