IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Instructional designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Aim, the storyboard and the module.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pilot, the learner and what is not understood.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Activity, the feedback and not putting a silly test.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
LMS, the figure and not inflating completion.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the deadline and not cutting the practice.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That they learn, and not leaving the empty video.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • course storyboard
  • modules
  • learner pilot
  • activities
  • LMS
  • completion
  • feedback
  • not a silly test

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

Analyse my job

Jobs with similar scores

  1. 252Aerospace engineer25%
  2. 253Environmental engineer25%
  3. 254Biomedical engineer25%
  4. 256Petroleum engineer25%
  5. 257Production engineer25%
  6. 258Robotics engineer25%