IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Pharmacovigilance officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Case, the file and MedDRA.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Seriousness, the link and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
File, the AEMPS deadline and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Signal, the aggregate and not playing it down.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The doctor, the ADR and not arguing the story.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
If it is serious, call it. And not staying quiet.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • ADR
  • MedDRA
  • AEMPS
  • safety signals
  • seriousness
  • causality
  • case files
  • regulatory deadlines

Sources for this job· O*NET 29-1051.00· ESCO/ISCO 2262

Analyse my job

Jobs with similar scores

  1. 233Aerospace engineer25%
  2. 234Environmental engineer25%
  3. 235Biomedical engineer25%
  4. 237Petroleum engineer25%
  5. 238Production engineer25%
  6. 239Robotics engineer25%