IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Politician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Speeches, notes and social pieces.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Legislative dossiers and template amendments.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Plenaries, committees and negotiation.
Estimate

No public source provides a precise figure. This is our estimate.

18%10%+1.8
Street, rallies and district listening.
Estimate

No public source provides a precise figure. This is our estimate.

18%8%+1.4
Press, debates and crisis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Cast the vote and own the office.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Speeches, notes and social pieces
  • Plenaries, committees and negotiation
  • Street, rallies and district listening
  • Press, debates and crisis
  • Cast the vote and own the office
  • politico
  • politician
  • diputado
  • concejal
  • alcalde

Sources for this job· O*NET 11-1031.00· ESCO/ISCO 1111

Analyse my job

Jobs with similar scores

  1. 228Aerospace engineer25%
  2. 229Environmental engineer25%
  3. 230Biomedical engineer25%
  4. 232Petroleum engineer25%
  5. 233Production engineer25%
  6. 234Robotics engineer25%