Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#277 / 763
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
QA automation engineer
27%
#185 / 763
View rankingQA automation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Test, the selector and the flake.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Pipeline, the green and the one that lies.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bug, the repro and not closing it blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Data, the environment and not sharing prod.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The developer, the rush and not skipping the one that fails.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Catch the bug, and not painting a lying green.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- automated tests
- selectors
- flakes
- QA pipelines
- repro
- environments
- lying green
- debug tests
Sources for this job· O*NET 15-1253.00· ESCO/ISCO 2519