Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Radio host
22%
#347 / 633
View rankingRadio host
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rundown, clips and a first script.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
On air, interviews and a silence that weighs.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Guests, producer and real time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Edit, podcast and the show’s socials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Voice, shifts and not going blank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not saying something you cannot take back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Rundown, clips and a first script
- Guests, producer and real time
- Edit, podcast and the show’s socials
- Voice, shifts and not going blank
- Not saying something you cannot take back
- locutor
- locutora
- radio host
Sources for this job· O*NET 27-3011.00· ESCO/ISCO 2656