Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#265 / 733
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142