Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Risk manager
29%
#60 / 633
View rankingRisk manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Maps, models and risk reporting.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 52% | +11.4 |
Policies, limits and stress tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Escalate an incident and talk to desks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Committee, exceptions and negotiation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Data quality and model assumptions.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Stop the risk and sign the opinion.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Maps, models and risk reporting
- Policies, limits and stress tests
- Escalate an incident and talk to desks
- Committee, exceptions and negotiation
- Data quality and model assumptions
- Stop the risk and sign the opinion
- risk manager
- gestor de riesgos
- riesgo operacional
Sources for this job· O*NET 13-2099.02· ESCO/ISCO 2413