IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

SCADA technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Screen, tags and the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the PLC and the one that will not answer.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Historian, the gap and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Network, the port and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shift, the doubt and not hiding the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they see the alarm, and not dressing the historian.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SCADA screens
  • alarms
  • historian
  • tags
  • ports
  • field PLC
  • not leave ports open
  • shifts

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 3114

Analyse my job

Jobs with similar scores

  1. 264Aerospace engineer25%
  2. 265Environmental engineer25%
  3. 266Biomedical engineer25%
  4. 268Petroleum engineer25%
  5. 269Production engineer25%
  6. 270Robotics engineer25%