Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Scrum master
25%
#251 / 633
View rankingScrum master
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Facilitate ceremonies, boards and notes.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Flow metrics and impediment reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 38% | +6.1 |
Team coaching and internal conflict.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 15% | +2.7 |
Protect the sprint from interruptions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Train PO and managers in the method.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Change the system, not just the ritual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Facilitate ceremonies, boards and notes
- Flow metrics and impediment reports
- Team coaching and internal conflict
- Protect the sprint from interruptions
- Train PO and managers in the method
- Change the system, not just the ritual
- scrum master
- agile coach
Sources for this job· O*NET 13-1111.00· ESCO/ISCO 2421