IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

SEN teaching assistant

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Classroom, the adjustment and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Yard, the group and the one who will not join.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Hygiene, the change and dignity.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Dining hall, the texture and the one who chokes.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The family, the note and not over-alarming.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be beside them, and not leaving them out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • classroom adjustments
  • inclusive yard
  • hygiene with dignity
  • dining hall
  • notes home
  • one-to-one support
  • special education
  • not over-alarm

Sources for this job· O*NET 25-9045.00· ESCO/ISCO 5312

Analyse my job

Jobs with similar scores

  1. 243Aerospace engineer25%
  2. 244Environmental engineer25%
  3. 245Biomedical engineer25%
  4. 247Petroleum engineer25%
  5. 248Production engineer25%
  6. 249Robotics engineer25%