Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Sociologist
25%
#252 / 623
View rankingSociologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Surveys, tables and a first report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Design the research and the questions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, interviews and groups.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Public client, ethics and outreach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Literature, theory and review.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not selling a chart that does not say that.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Surveys, tables and a first report
- Design the research and the questions
- Field, interviews and groups
- Public client, ethics and outreach
- Literature, theory and review
- Not selling a chart that does not say that
- sociologo
- sociologist
Sources for this job· O*NET 19-3041.00· ESCO/ISCO 2632