IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Stagehand

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plot, marks and the weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Change, blackout and the one who is late.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Loads, pulleys and the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Technical rehearsal and the one who walks the light.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The show, the surprise and not improvising loads.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Take nobody down, and the change on time.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • blackout changes
  • stage marks
  • pulleys
  • loads
  • technical rehearsal
  • sets
  • the show
  • weights

Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435

Analyse my job

Jobs with similar scores

  1. 228Aerospace engineer25%
  2. 229Environmental engineer25%
  3. 230Biomedical engineer25%
  4. 232Petroleum engineer25%
  5. 233Production engineer25%
  6. 234Robotics engineer25%