IS WORK OVER?

Automation index

How much of a Civil engineer’s job can AI already do?

Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Sterile processing technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Intake, the dirty and the count.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Wash, the ultrasonic and what is left.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Pack, the indicator and the set.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Autoclave, the load and the cycle that fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Theatre, the rush and not sending a wet set.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Truly sterile, and not mixing the dirty.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • autoclave
  • surgical sets
  • biological indicators
  • ultrasonic wash
  • sterile pack
  • instrument count
  • steam cycles
  • not mix dirty

Sources for this job· O*NET 31-9093.00· ESCO/ISCO 3213

Analyse my job

Jobs with similar scores

  1. 234Aerospace engineer25%
  2. 235Environmental engineer25%
  3. 236Biomedical engineer25%
  4. 238Petroleum engineer25%
  5. 239Production engineer25%
  6. 240Robotics engineer25%