Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Technical writer
28%
#115 / 633
View rankingTechnical writer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structure, API docs and the tutorial.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Screenshots, versions and not leaving the old shot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The engineer who will not write, and extracting the how.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Legal review, i18n and the changelog.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Support, the tickets and what the doc misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it can be installed, and not documenting thin air.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- document APIs
- product tutorials
- screenshots
- changelogs
- extract knowledge
- docs i18n
- version review
- support tickets
Sources for this job· O*NET 27-3042.00· ESCO/ISCO 2641