Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Train driver
18%
#559 / 623
View rankingTrain driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, notices and train logs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, brake and obey signals.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Incidents, passengers and radio.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Fitness, fatigue and rules.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Shunting, depots and couplings.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Not running a red or a platform.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Diagrams, notices and train logs
- Drive, brake and obey signals
- Incidents, passengers and radio
- Fitness, fatigue and rules
- Shunting, depots and couplings
- Not running a red or a platform
- maquinista
- train driver
- conductor de tren
Sources for this job· O*NET 53-4011.00· ESCO/ISCO 8311