Automation index
How much of a Civil engineer’s job can AI already do?
Calcs and drawings speed up. Being on site, stamping, and owning ground that is not the model do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil engineer
25%
AI can already do 25% of this job.
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142
IS WORK OVER?
Web developer
26%
#198 / 623
View rankingWeb developer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Layout, components and API consumption.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Accessibility, performance and technical SEO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Design, product and the client who changes their mind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Deploys, incidents and monitoring.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Tests, code review and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not shipping a half-change on a Friday.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- write code
- programming
- software development
- coding
- debug code
- Layout, components and API consumption
- Deploys, incidents and monitoring
- Tests, code review and documentation
- Not shipping a half-change on a Friday
- desarrollador web
Sources for this job· O*NET 15-1254.00· ESCO/ISCO 2513