IS WORK OVER?

Automation index

How much of a Civil protection volunteer’s job can AI already do?

A protocol and a log come earlier. A flood and getting someone out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Civil protection volunteer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocols, logs and radios.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Deploy, rescue and emergency logistics.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Public, evacuation and calm.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Kit, stores and maintenance.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Shifts, fatigue and 112 coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Not getting in the firefighters’ way or leaving someone.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Protocols, logs and radios
  • Deploy, rescue and emergency logistics
  • Public, evacuation and calm
  • Kit, stores and maintenance
  • Shifts, fatigue and 112 coordination
  • proteccion civil
  • civil protection

Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5419

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 585Shepherd18%
  2. 586Vehicle painter18%
  3. 587Podiatrist18%
  4. 589Upholsterer18%
  5. 590Taxi driver18%
  6. 591Lighting technician18%