Automation index
How much of a Civil registry officer’s job can AI already do?
An entry comes earlier. The name and the death being right, without losing the book, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil registry officer
27%
AI can already do 27% of this job.
#196 / 753
View rankingCivil registry officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Entry, the book and the record.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Birth, the deadline and the one who is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Marriage, the impediment and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Death, the family and not mixing the dead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The registrar judge and not losing the volume.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is right, and not losing the book.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- entries
- registry books
- births
- marriages
- deaths
- records
- registry deadlines
- volumes
Sources for this job· O*NET 43-4031.00· ESCO/ISCO 3359
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115