Automation index
How much of a Civil registry officer’s job can AI already do?
An entry comes earlier. The name and the death being right, without losing the book, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Civil registry officer
27%
AI can already do 27% of this job.
#193 / 743
View rankingCivil registry officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Entry, the book and the record.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Birth, the deadline and the one who is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Marriage, the impediment and not jumping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Death, the family and not mixing the dead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The registrar judge and not losing the volume.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is right, and not losing the book.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- entries
- registry books
- births
- marriages
- deaths
- records
- registry deadlines
- volumes
Sources for this job· O*NET 43-4031.00· ESCO/ISCO 3359
IS WORK OVER?
Control engineer
22%
#386 / 743
View rankingControl engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
PID, tune and the model.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the swing and the one that runs away.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Mode, manual and not leaving it for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Alarm, the interlock and not silencing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the recipe and not changing blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not swing, and not leaving manual for ever.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PID
- tune
- swings
- manual mode
- interlocks
- recipes
- control models
- not silence alarms
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149