Automation index
How much of a Climatologist’s job can AI already do?
A series comes earlier. Attributing the change without selling the easy headline do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Climatologist
27%
AI can already do 27% of this job.
#140 / 623
View rankingClimatologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Series, homogenise and the gap.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Models, scenarios and the uncertainty.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Report, the headline and not selling the easy one.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Field, the station and the one that moves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The politician, the figure and not staying quiet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Attribute, and not selling the headline.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- climate series
- homogenise
- scenarios
- uncertainty
- headlines
- stations
- climate reports
- attribution
Sources for this job· O*NET 19-2021.00· ESCO/ISCO 2112
IS WORK OVER?
Aerospace engineer
25%
#228 / 623
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144