Automation index
How much of a Climatologist’s job can AI already do?
A series comes earlier. Attributing the change without selling the easy headline do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Climatologist
27%
AI can already do 27% of this job.
#140 / 623
View rankingClimatologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Series, homogenise and the gap.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Models, scenarios and the uncertainty.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Report, the headline and not selling the easy one.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Field, the station and the one that moves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The politician, the figure and not staying quiet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Attribute, and not selling the headline.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- climate series
- homogenise
- scenarios
- uncertainty
- headlines
- stations
- climate reports
- attribution
Sources for this job· O*NET 19-2021.00· ESCO/ISCO 2112
IS WORK OVER?
Mining engineer
22%
#341 / 623
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146