IS WORK OVER?

Automation index

How much of a Climbing instructor’s job can AI already do?

A knot protocol comes earlier. Belaying so they do not actually fall do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Climbing instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Knots, harness and the briefing.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Wall, the panic and the one who freezes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Belay, the factor and not getting distracted.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rock, anchors and the one that is loose.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The group, the ego and not going too high.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That they do not fall, and the knot tied.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • knots
  • harness
  • belay
  • fall factor
  • anchors
  • the wall
  • panic
  • route briefing

Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 501Shutter installer19%
  2. 502Window installer19%
  3. 503Diving instructor19%
  4. 505Restaurant maître19%
  5. 506Judge19%
  6. 507Speech therapist19%