Automation index
How much of a Climbing instructor’s job can AI already do?
A knot protocol comes earlier. Belaying so they do not actually fall do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Climbing instructor
19%
AI can already do 19% of this job.
#514 / 643
View rankingClimbing instructor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Knots, harness and the briefing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Wall, the panic and the one who freezes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Belay, the factor and not getting distracted.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rock, anchors and the one that is loose.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The group, the ego and not going too high.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That they do not fall, and the knot tied.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- knots
- harness
- belay
- fall factor
- anchors
- the wall
- panic
- route briefing
Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422
IS WORK OVER?
Concrete finisher
19%
#530 / 643
View rankingConcrete finisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, joints and thickness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pour, vibrate and float.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Screed, power float and the right moment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cure, polythene and the windy day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late mixer and the one who wants water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack open, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pour concrete
- vibrate
- float
- shrinkage joints
- power float
- cure
- screed
- slab thickness
Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114