IS WORK OVER?

Automation index

How much of a Climbing instructor’s job can AI already do?

A knot protocol comes earlier. Belaying so they do not actually fall do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Climbing instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Knots, harness and the briefing.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Wall, the panic and the one who freezes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Belay, the factor and not getting distracted.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rock, anchors and the one that is loose.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The group, the ego and not going too high.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That they do not fall, and the knot tied.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • knots
  • harness
  • belay
  • fall factor
  • anchors
  • the wall
  • panic
  • route briefing

Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422

Corrosion engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Thicknesses, the map and the coupon.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the pipe and the one that is thin.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cathode, the protection and the one that will not take.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shutdown, the coating and not painting over rust.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the rush and not leaving the thin one in service.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop before it goes, and not painting over it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • thicknesses
  • corrosion maps
  • cathodic protection
  • coatings
  • thin pipes
  • shutdowns
  • rust
  • coupons

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 607Shutter installer19%
  2. 608Window installer19%
  3. 609Diving instructor19%
  4. 611Restaurant maître19%
  5. 612Judge19%
  6. 613Speech therapist19%