IS WORK OVER?

Automation index

How much of a Climbing instructor’s job can AI already do?

A knot protocol comes earlier. Belaying so they do not actually fall do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Climbing instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Knots, harness and the briefing.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Wall, the panic and the one who freezes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Belay, the factor and not getting distracted.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rock, anchors and the one that is loose.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The group, the ego and not going too high.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That they do not fall, and the knot tied.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • knots
  • harness
  • belay
  • fall factor
  • anchors
  • the wall
  • panic
  • route briefing

Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 501Shutter installer19%
  2. 502Window installer19%
  3. 503Diving instructor19%
  4. 505Restaurant maître19%
  5. 506Judge19%
  6. 507Speech therapist19%