Automation index
How much of a Climbing instructor’s job can AI already do?
A knot protocol comes earlier. Belaying so they do not actually fall do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Climbing instructor
19%
AI can already do 19% of this job.
#504 / 633
View rankingClimbing instructor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Knots, harness and the briefing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Wall, the panic and the one who freezes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Belay, the factor and not getting distracted.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rock, anchors and the one that is loose.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The group, the ego and not going too high.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That they do not fall, and the knot tied.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- knots
- harness
- belay
- fall factor
- anchors
- the wall
- panic
- route briefing
Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422
IS WORK OVER?
Process engineer
26%
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141