IS WORK OVER?

Automation index

Can AI do the work of a Cloud architect?

A diagram and sample Terraform come out. Signing a design that costs €40k a month does not.

It also does not predict how many people will lose their jobs.

Task comparison

Cloud architect

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Diagrams, ADRs and a first IaC pass.
Estimate

No public source pins this saving. It is an estimate of the method.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source pins this saving. It is an estimate of the method.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source pins this saving. It is an estimate of the method.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source pins this saving. It is an estimate of the method.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source pins this saving. It is an estimate of the method.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source pins this saving. It is an estimate of the method.

14%14%+2
Total100%28%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Architect

Where the time goes

Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.

Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.

TaskShareAIAdds
Draft plans, sections and a first BIM model from the brief.
Estimate

No public source pins this saving. It is an estimate of the method.

22%48%+10.6
Produce renders, views and façade options.
Estimate

No public source pins this saving. It is an estimate of the method.

18%40%+7.2
Write quantities, specs and the project report.
Estimate

No public source pins this saving. It is an estimate of the method.

16%28%+4.5
Meetings with client, developer and planning office.
Estimate

No public source pins this saving. It is an estimate of the method.

16%18%+2.9
Site direction and inspection visits.
Estimate

No public source pins this saving. It is an estimate of the method.

16%12%+1.9
Stamp, register and own legal responsibility.
Estimate

No public source pins this saving. It is an estimate of the method.

12%8%+1
Total100%28%

Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low

Skills this job uses

  • building plans
  • renders
  • sign a project
  • Produce renders, views and façade options
  • Site direction and inspection visits
  • arquitect
  • architect
  • proyecto de edificio

Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161

Analyse my job

Nearby in the ranking

  1. 48Database administrator28%
  2. 49Farmer28%
  3. 50Architect28%
  4. 52Barista28%
  5. 53Waiter28%
  6. 54Cook28%