IS WORK OVER?

Automation index

How much of a Cloud architect’s job can AI already do?

A diagram and sample Terraform come out. Signing a design that costs €40k a month does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 79Logistics analyst28%
  2. 80SOC analyst28%
  3. 81Architect28%
  4. 83Data architect28%
  5. 84Barista28%
  6. 85Bank teller28%