Automation index
How much of a Cloud architect’s job can AI already do?
A diagram and sample Terraform come out. Signing a design that costs €40k a month does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cloud architect
28%
AI can already do 28% of this job.
#82 / 623
View rankingCloud architect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagrams, ADRs and a first IaC pass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Cost estimate, Well-Architected and gaps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Review PRs, security and network.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Align with security, finops and product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
PoCs, real failures and vendor limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Sign the design and own the incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Diagrams, ADRs and a first IaC pass
- Cost estimate, Well-Architected and gaps
- Review PRs, security and network
- Align with security, finops and product
- PoCs, real failures and vendor limits
- Sign the design and own the incident
- arquitecto cloud
Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511
IS WORK OVER?
Harbour pilot
20%
#460 / 623
View rankingHarbour pilot
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Chart, draught and the manoeuvre plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Board, conning and the tug.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Wind, current and coming alongside.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Pilotage, the master and not fighting the bridge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fog, the closure and the yes or no to enter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get it in whole, and not scraping the bottom.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pilotage
- conning
- draughts
- tugs
- come alongside
- charts
- beam wind
- the basin
Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152