IS WORK OVER?

Automation index

How much of a Cloud architect’s job can AI already do?

A diagram and sample Terraform come out. Signing a design that costs €40k a month does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Physicist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Simulate, fit and reduce data.
Estimate

No public source provides a precise figure. This is our estimate.

22%50%+11
Draft papers, posters and proposals.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Design the experiment and the apparatus.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Measure in the lab or in the field.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Argue with the group and peer-review.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Win machine time and funding.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Simulate, fit and reduce data
  • Draft papers, posters and proposals
  • Design the experiment and the apparatus
  • Measure in the lab or in the field
  • Argue with the group and peer-review
  • Win machine time and funding
  • fisico
  • physicist

Sources for this job· O*NET 19-2012.00· ESCO/ISCO 2111

Analyse my job

Jobs with similar scores

  1. 79Logistics analyst28%
  2. 80SOC analyst28%
  3. 81Architect28%
  4. 83Data architect28%
  5. 84Barista28%
  6. 85Bank teller28%