IS WORK OVER?

Automation index

How much of a CNC machinist’s job can AI already do?

A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 272Intercultural mediator24%
  2. 273Internist24%
  3. 274Neurologist24%
  4. 276Factory operator24%
  5. 277Landscape architect24%
  6. 278University professor24%