Automation index
How much of a CNC machinist’s job can AI already do?
A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
CNC machinist
24%
AI can already do 24% of this job.
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223
IS WORK OVER?
Chemist
26%
#209 / 633
View rankingChemist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocols, calcs and safety sheets.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Batch reports, charts and docs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Synthesis, titration and sample handling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 15% | +2.7 |
Read a strange result and repeat it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Plant safety and waste.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Sign quality and talk to production.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Protocols, calcs and safety sheets
- Batch reports, charts and docs
- Synthesis, titration and sample handling
- Read a strange result and repeat it
- Plant safety and waste
- Sign quality and talk to production
- quimico
- chemist
- laboratorio quimico
Sources for this job· O*NET 19-2031.00· ESCO/ISCO 2113