Automation index
How much of a CNC machinist’s job can AI already do?
A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
CNC machinist
24%
AI can already do 24% of this job.
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223
IS WORK OVER?
Court-appointed expert
26%
#208 / 633
View rankingCourt-appointed expert
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Accept the appointment, collect the file and plan the survey.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Inspection, measurements and samples.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Write the report, annexes and replies to challenges.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Confirm in court and answer the parties.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate with the procurator, the court and other experts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Records, fee assessment and liability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Inspection, measurements and samples
- Confirm in court and answer the parties
- Records, fee assessment and liability
- perito judicial
- perito
- forensic expert
Sources for this job· O*NET 19-4092.00· ESCO/ISCO 3119