IS WORK OVER?

Automation index

How much of a CNC machinist’s job can AI already do?

A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Court-appointed expert

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Accept the appointment, collect the file and plan the survey.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Inspection, measurements and samples.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Write the report, annexes and replies to challenges.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Confirm in court and answer the parties.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate with the procurator, the court and other experts.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Records, fee assessment and liability.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Inspection, measurements and samples
  • Confirm in court and answer the parties
  • Records, fee assessment and liability
  • perito judicial
  • perito
  • forensic expert

Sources for this job· O*NET 19-4092.00· ESCO/ISCO 3119

Analyse my job

Jobs with similar scores

  1. 272Intercultural mediator24%
  2. 273Internist24%
  3. 274Neurologist24%
  4. 276Factory operator24%
  5. 277Landscape architect24%
  6. 278University professor24%