IS WORK OVER?

Automation index

How much of a CNC machinist’s job can AI already do?

A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Curriculum designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sequence, criteria and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pilot classroom, the teacher and what will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Rubric, the marker and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Review, inspection and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The publisher, the deadline and not swallowing a cut.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be taught, and not dying in the PDF.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • teaching sequences
  • criteria
  • rubrics
  • pilot classrooms
  • curriculum kit
  • inspection
  • publishers
  • dead PDF

Sources for this job· O*NET 25-9031.00· ESCO/ISCO 2351

Analyse my job

Jobs with similar scores

  1. 288Intercultural mediator24%
  2. 289Internist24%
  3. 290Neurologist24%
  4. 292Factory operator24%
  5. 293Landscape architect24%
  6. 294University professor24%