Automation index
How much of a CNC machinist’s job can AI already do?
A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
CNC machinist
24%
AI can already do 24% of this job.
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223
IS WORK OVER?
DJ
20%
#448 / 633
View rankingDJ
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Prep crates, edits and setlists.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 42% | +7.6 |
Promo, contracts and riders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Play live and read the floor.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Room sound, desk and technical faults.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Venue, talent buyer and crowd.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
Brand, touring and own catalogue.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Prep crates, edits and setlists
- Promo, contracts and riders
- Play live and read the floor
- Room sound, desk and technical faults
- Venue, talent buyer and crowd
- Brand, touring and own catalogue
- pinchadiscos
- disc jockey
Sources for this job· O*NET 27-2042.00· ESCO/ISCO 2652