Automation index
How much of a CNC machinist’s job can AI already do?
A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
CNC machinist
24%
AI can already do 24% of this job.
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223
IS WORK OVER?
Inside sales
27%
#143 / 633
View rankingInside sales
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cadence, list and the call.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Demo, objections and the one who does not answer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
CRM, the next step and not inflating the pipeline.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The SDR, the handoff and not fighting the lead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The month, the quota and not discounting extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Close without a visit, and that they pick up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cadences
- demos
- pipeline
- next step
- quota
- SDR
- objections
- cold calls
Sources for this job· O*NET 41-3091.00· ESCO/ISCO 2433