Automation index
How much of a CNC machinist’s job can AI already do?
A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
CNC machinist
24%
AI can already do 24% of this job.
#275 / 633
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223
IS WORK OVER?
Insulation installer
22%
#318 / 633
View rankingInsulation installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, thicknesses and the panel list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Fit, seal and the bridge you leave.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Roof, façade and the wind on the scaffold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Barriers, vapour and condensation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The designer, the change and late material.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No bridge, and not crushing the insulation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit insulation
- thermal bridges
- vapour barrier
- thicknesses
- insulated façade
- condensation
- seal panels
- roof
Sources for this job· O*NET 47-2131.00· ESCO/ISCO 7124