IS WORK OVER?

Automation index

How much of a CNC machinist’s job can AI already do?

A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Marine engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Rounds, parameters and the engine log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Breakdown, the sea and repairing with what you have.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Fuel, oils and the port change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Watch, alarms and the one who does not sleep.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Survey, class and not dressing the log.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Last the crossing, and not silencing the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • engine rounds
  • engine log
  • breakdowns at sea
  • watches
  • class
  • fuels
  • engine-room alarms
  • repair on passage

Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151

Analyse my job

Jobs with similar scores

  1. 272Intercultural mediator24%
  2. 273Internist24%
  3. 274Neurologist24%
  4. 276Factory operator24%
  5. 277Landscape architect24%
  6. 278University professor24%