IS WORK OVER?

Automation index

How much of a CNC machinist’s job can AI already do?

A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Robotics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Paths, PLC and the cell twin.
Estimate

No public source provides a precise figure. This is our estimate.

16%48%+7.7
Cell, grippers and the cycle that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Safety, fencing and CE validation.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Maintenance, backups and the overwritten program.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, takt and the robot that stops.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it takes nobody with it, and signing the cell.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program robots
  • paths
  • robot cells
  • safety fencing
  • cell PLC
  • CE validation
  • grippers
  • takt

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 272Intercultural mediator24%
  2. 273Internist24%
  3. 274Neurologist24%
  4. 276Factory operator24%
  5. 277Landscape architect24%
  6. 278University professor24%