IS WORK OVER?

Automation index

How much of a CNC machinist’s job can AI already do?

A program and a simulation come earlier. Setting zero, hearing the machine, and not breaking the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Sailor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Log, checklists and paper watches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Charts, weather and passage planning.
Estimate

No public source provides a precise figure. This is our estimate.

14%25%+3.5
Deck, lines, cargo and upkeep.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Watch, helm and lookout.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Emergencies, abandon ship and fire.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Life aboard, ports and fatigue.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%17%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Log, checklists and paper watches
  • Charts, weather and passage planning
  • Deck, lines, cargo and upkeep
  • Watch, helm and lookout
  • Emergencies, abandon ship and fire
  • Life aboard, ports and fatigue
  • marinero
  • sailor
  • gente de mar

Sources for this job· O*NET 53-5011.00· ESCO/ISCO 8350

Analyse my job

Jobs with similar scores

  1. 272Intercultural mediator24%
  2. 273Internist24%
  3. 274Neurologist24%
  4. 276Factory operator24%
  5. 277Landscape architect24%
  6. 278University professor24%