Automation index
How much of a Coast guard’s job can AI already do?
A shout comes earlier. Getting the one who is drowning out without losing the boat do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Coast guard
19%
AI can already do 19% of this job.
#592 / 743
View rankingCoast guard
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shout, the position and the boat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sea, the one who is drowning and the storm.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Inspection, the trawler and the one that runs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Night, the radar and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The station, the note and not dressing the shortfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get the one who is drowning, and not losing the boat.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boats
- shouts
- drowning
- trawlers
- radar
- the storm
- inspections at sea
- station notes
Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411
IS WORK OVER?
Corrosion engineer
22%
#387 / 743
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145