Automation index
How much of a Coast guard’s job can AI already do?
A shout comes earlier. Getting the one who is drowning out without losing the boat do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Coast guard
19%
AI can already do 19% of this job.
#592 / 743
View rankingCoast guard
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shout, the position and the boat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Sea, the one who is drowning and the storm.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Inspection, the trawler and the one that runs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Night, the radar and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The station, the note and not dressing the shortfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Get the one who is drowning, and not losing the boat.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boats
- shouts
- drowning
- trawlers
- radar
- the storm
- inspections at sea
- station notes
Sources for this job· O*NET 33-3051.00· ESCO/ISCO 5411
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142