Automation index
How much of a Cobbler’s job can AI already do?
A sole quote comes earlier. Stitching, sticking and not coming off on day three do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cobbler
19%
AI can already do 19% of this job.
#559 / 643
View rankingCobbler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnose, sole and the quote.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Stitch, stick and the heel that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Last, the fit and the one that pinches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Colour, cream and the pair that does not match.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the dance and not cutting the vamp.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not come off, and not leaving a lame heel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stitch soles
- stick heels
- lasts
- creams
- vamp
- shoe fit
- pairs
- cobbler quotes
Sources for this job· O*NET 51-6041.00· ESCO/ISCO 7536
IS WORK OVER?
Aerospace engineer
25%
#233 / 643
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144