Automation index
How much of a Cobbler’s job can AI already do?
A sole quote comes earlier. Stitching, sticking and not coming off on day three do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cobbler
19%
AI can already do 19% of this job.
#549 / 633
View rankingCobbler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnose, sole and the quote.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Stitch, stick and the heel that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Last, the fit and the one that pinches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Colour, cream and the pair that does not match.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the dance and not cutting the vamp.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not come off, and not leaving a lame heel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stitch soles
- stick heels
- lasts
- creams
- vamp
- shoe fit
- pairs
- cobbler quotes
Sources for this job· O*NET 51-6041.00· ESCO/ISCO 7536
IS WORK OVER?
Data engineer
31%
#36 / 633
View rankingData engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design pipelines, models and orchestration.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 50% | +12 |
Write SQL, Spark and data tests.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 45% | +8.1 |
Incidents, quality and lineage in production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Talk to analysts and negotiate data contracts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Cloud cost, permissions and PII.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Decide architecture and technical debt.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 20% | +2.4 |
| Total | 100% | 31% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Design pipelines, models and orchestration
- Write SQL, Spark and data tests
- Cloud cost, permissions and PII
- Decide architecture and technical debt
- ingeniero de datos
- data engineer
- etl
Sources for this job· O*NET 15-1243.00· ESCO/ISCO 2511