Automation index
How much of a Cobbler’s job can AI already do?
A sole quote comes earlier. Stitching, sticking and not coming off on day three do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Cobbler
19%
AI can already do 19% of this job.
#659 / 743
View rankingCobbler
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnose, sole and the quote.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Stitch, stick and the heel that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Last, the fit and the one that pinches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Colour, cream and the pair that does not match.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the dance and not cutting the vamp.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not come off, and not leaving a lame heel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stitch soles
- stick heels
- lasts
- creams
- vamp
- shoe fit
- pairs
- cobbler quotes
Sources for this job· O*NET 51-6041.00· ESCO/ISCO 7536
IS WORK OVER?
Geotechnical engineer
22%
#398 / 743
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142