IS WORK OVER?

Automation index

How much of a Cobbler’s job can AI already do?

A sole quote comes earlier. Stitching, sticking and not coming off on day three do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Cobbler

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnose, sole and the quote.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Stitch, stick and the heel that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Last, the fit and the one that pinches.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Colour, cream and the pair that does not match.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the dance and not cutting the vamp.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not come off, and not leaving a lame heel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • stitch soles
  • stick heels
  • lasts
  • creams
  • vamp
  • shoe fit
  • pairs
  • cobbler quotes

Sources for this job· O*NET 51-6041.00· ESCO/ISCO 7536

Mechanical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, model and simulate parts and assemblies.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and bills of materials.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Meetings with shop, client and purchasing.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Tests, prototypes and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Rules, quality and CE documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Sign, register and own the design.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Meetings with shop, client and purchasing
  • Tests, prototypes and commissioning
  • Rules, quality and CE documentation
  • Sign, register and own the design
  • ingeniero mecanico
  • mechanical engineer

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 556Valet19%
  2. 557Glassblower19%
  3. 558Stained-glass artist19%
  4. 560Dog trainer18%
  5. 561Forest ranger18%
  6. 562Aerial technician18%